Client/Owner: Mapna /Iran Power Development Company (IPDC)
Subject of the project: providing and distributing system of drinking water and also healthy wastewater filtration of the powerhouse. Type of the project: EPC Condition:P.A.C. in 2013
Subject of the project: gas and gasoline supplying system, containing 3 gasoline reservoirs with the capacity of 20,000 m3 and piping system from the unloading area to the reservoirs and injecting it to the turbines and also pressure reduction system and the primary and secondary transfer lines to of the powerhouse. Type of the project: EPC Condition:Delivered in 2015
Subject of the project: the complete steam supplying system of the powerhouse containing 2 boilers with the capacity of 8 Tons of saturated steam per hour in addition to all spare equipments. Type of the project: EPC Condition:Delivered in 2015
Subject of the project: developing the entire powerhouse fire quenching system by water and foam. Type of the project: EPC Condition:Delivered in 2015